Double Drum Asphalt Plants [40-150 TPH]

Double the Efficiency, Half the Emissions – Perfect Mix!

View Products

Products

Lorem Ipsum is simply dummy text of the printing.

DDM 45

DDM 45

40-60 TPH | Perfect for medium-sized projects | 500 KG

DDM 50

DDM 50

60-90 TPH | Designed for high-output operations | 700 KG

DDM 60

DDM 60

90-120 TPH | Ideal for large-scale projects with tighter timelines | 1000 KG

DDM 65

DDM 65

120-150 TPH | The ultimate choice for megaprojects | 1200 KG

Overview

Continuous Production Meets Eco-Conscious Engineering

Our Double Drum Asphalt Plants feature advanced dual-drum technology that ensures efficient drying and blending of aggregates while maintaining consistent quality. Designed for both stationary and mobile setups, these plants integrate up to 25% RAP material and low NOx burners, making them eco-friendly and cost-effective solutions for modern road construction.

Intro Image

BENEFITS

Why Double Drum? (Advantages Over Single Drum)

Unmatched Fuel Efficiency

  • Counter-rotating drums maximize heat transfer to (save 200+ liters/hour)
  • Waste heat recovery preheats aggregates

Precision Mixing

+
  • Longer retention time ensures homogeneous coating
  • Infrared thermography monitors mix consistency

Eco-Compliance Made Easy

+
  • Built-in baghouse (≤20 mg/Nm³ emissions)
  • 30% RAP without burner modifications

Low Maintenance Design

+
  • Quick-release drum liners (replace in 4 hours)
  • Lubrication-free bearings for desert/coastal use

CONNECT WITH US

Ready to Build? Let’s Talk!

Fill out the form to share your project needs and discuss the best option for it.

Phone

Frequently asked questions.

1. How does double drum design reduce emissions?

The parallel airflow extends combustion time, lowering NOx by 30% vs. single drums. Our DDM-65 meets EU Stage V without afterburners.

2. Can I switch between virgin/RAP mixes easily?

+
Yes. Our advanced control system would allow you to auto adjust various parameters, including:
  • Burner temperature (±5°C)
  • Drum speed (±10 RPM)
  • Feed ratios (0-30% RAP)

3. What’s the typical installation timeline?

+
It’s mostly a couple of weeks, and varies depending on the model and capacity that you choose. For instance:
  • DDM-45/60: 10-12 days
  • DDM-65: 14 days (includes baghouse commissioning)

4. Can Atlas customize its Double Drum Plants for unique project requirements?

+
Absolutely! Our Double Drum Plants can be customized to include options likeadditives, pollution control units, and multi-fuel burners to accommodate diverse fuel sources and specific mix designs.