Atlas compressed manufacturing to 40 days and commissioned the plant on site, with a 25% RAP system, while a parallel order was still in transit.
The client ordered two complete plants with a 45-day delivery deadline, a target that standard industry lead times make nearly impossible for even one plant.
The client’s project schedule left only 45 days to deliver, with no room to extend.
Typical manufacturing cycles run well beyond 45 days for a single plant, so a standard approach would miss the deadline.
The client needed the plant producing in Nigeria, not just shipped, so manufacturing, transport, installation and commissioning all had to fit into one tight window.
Atlas rebuilt its production schedule around the client’s deadline and pushed its engineering team to peak output to deliver a complete plant on time.



1 × MABP 120 Mobile Asphalt Batch Mix Plant with an integrated 25% RAP system, fully installed and commissioned on site.
Dedicated production scheduling and peak engineering output let Atlas complete one full plant in 40 days.
Atlas installed and commissioned the plant in Nigeria, and it reached full operation within 2 months of order placement.
“We needed a plant on site quickly, and Atlas delivered. They built it, shipped it and commissioned it while our other order was still on its way. That speed made the difference for our project.”
Managing Director
Leading Road Construction Company, Nigeria
Talk to Atlas engineers about fast-track manufacturing, mobile configurations and on-site commissioning for your next project.